Jul 03, 2020
Plan Review
- (16 hours)
Category: Research
Detailed review of plans and completed items to date. Noted discrepancies and items to purchase.
Questions:
- Drawing XNB-L03 Where is part XNB-L03-07 cable guide used?
- XNB-T09/T10 Part XNB-T10-05 rolled knuckle hinges were installed on the rudder rather than MS20001P3 extruded hinges.
- Check XNB-F03 rear spar fitting is accessible. Align holes and updrill to 5/16 for pins with wings attached.
+ Check XNB-F05 Aft tunnel web rivets
$ ABS-C01-03 pushrod fairing for enclosing rear marker light
$ Snap vents for wind screen
$ Wing tie downs
$ Pitot, Total Energy, and port plug from W&W
$ Silk thread for wire bundles
$ SNX-W18-03 cover plates for adding inspection ports